01 · Wellpoint dewatering

Dewatering

Good dewatering starts at the very beginning. We make sure your excavation stays dry, from permit to finishing touch.

Pump fleet
320
Drilling rigs
2
Method
Machine & manual

Step 1

Notification or permit

For some years now, a notification or permit has been required to carry out dewatering. You obtain it through the Omgevingsloket Vlaanderen. For us, the permit is where the job starts: without it we can't begin.

Step 2

What we need for your quote

  1. 01Name or company name
  2. 02Contact person (name, mobile number, email)
  3. 03Site address and correspondence address
  4. 04Dimensions of the excavation, i.e. of the underground structure: at least length, width and excavation depth
  5. 05Additional data such as soundings, soil surveys and studies
  6. 06Photos of the site area or the work to be done

Step 3

Preparation & execution

Once the quote is approved, we start preparing: a site visit, planning and coordination. Our checklist lists every point of attention for the job.

We carry out our work by machine or by hand. With two drilling rigs we can handle even the toughest sites and soils. The type of work and the soil determine which method we choose.

Dewatering beside a house
Dewatering pump with sand separator
Aerial view of an excavation
Aerial view of a dewatering installation